TRIDENT-EAST Ltd. has been chosen to provide services on driving of conductor string during construction of exploratory and evaluation well No.2 Skuratovskaya from a jack-up rig offshore in the Kara Sea for GAZPROM NEDRA LLC. The Skuratorvskaya block is located in the South-West part of the Kara Sea. In terms of administrative territory, it is located in Ural federal district and Yamalo-Nenets autonomous district of Russia.
The set of services provided included the following:
- Analysis of conductor driving using GRLWEAP software
- Development of work program
- Performance of work onboard the Jack-up Rig “ARKTICHESKAYA”
- Provision of Final Report.
All planned operations have been completed within the set time limits. As a result, the conductor string was driven to the depth of 69 meters below sea bottom level within just two days.